Plan for today is:

- Completed Timeline

- Start working on the first of many presentations 

- Try to think of any other ideas I would've gone with if I couldn't have done writing (think of least 3) because of the fact is I don't have a contingency plan if this fails  


Plan for the future

- The stage of my idea generation should have been completed by the end of September 2012

- The research stage should be done by end of October 2012

- The design stage should be done by end of November 2012 

- The production will be started start of December and be done by end of April 2013  

- Completion of evaluation should be done before the hand-in for the evaluation, the hand-in being start of June 2013  

In total the whole thing should last 9 months which isn't a very long time when you look at it from a distance. 

The dates above are not set in stone so they could change over time, the above is just a guess, I should have the solid dates by Christmas.  